GERODO Gerüsttechnik

Prepare scaffolding and solar installation together.

A solar project connects roofing, electrical work, deliveries and scaffolding planning. Knowing each team’s work areas and dates early helps assess the scaffolding requirements more precisely.

Describe the work areas

State which roof areas and sides of the building will be worked on.

Consider access

People, tools and materials need coordinated routes to the work area.

Connect the dates

Scaffolding assembly, solar work and dismantling form a linked sequence.

Which site details are useful?

Alongside the address, roof shape, intended installation areas, extensions and accessible sides help us prepare. Explain whether work concerns the roof alone or also the façade, gutters and gables. Existing photos and plans make follow-up questions easier.

Protection requires technical assessment

Scaffolding for façade work does not automatically suit every roofing activity. Protection, access and work areas are assessed for the specific use. Technical assessment and execution planning are carried out for each project.

Coordinate materials and dates

Ask your solar contractor when panels will arrive, how they will reach the roof and how long the work should take. Mention restrictions involving driveways, pavements and standing areas. If installation plans change, discuss the scaffolding period again in good time.

  1. Talk to the solar contractor

    Gather installation areas, access plans, deliveries and preferred dates.

  2. Enquire about scaffolding

    Provide the address, activity, period and existing documents.

  3. Clarify execution together

    Review technical needs, included services and confirmed dates.

Do I need to know the required scaffolding class?

Describe the intended work for the initial enquiry. The necessary scaffolding arrangement is clarified during technical review.

Can my solar contractor submit the enquiry?

Yes. The business can describe the site and work sequence directly. The client, contact person and quotation address should be clearly identified.

Your scaffolding quote in 24 hours.

A free quotation within 24 hours after technical review.

The period starts once your project details are complete and the technical review is finished. We clarify any outstanding points with you first.

Request scaffolding for roofing or solar

Start with the work you have planned.

Whether you own the building or organise the installation, we review your details and assess the scaffolding requirements for the site.